From: route@monster.com
Sent: Friday, April 08, 2016 12:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
LEONARD J DEMMER
16345 COUNTY ROAD 946 Career Objectives
Continued growth in professional engineering and managerial
skills, culminating in exemplary engineering and managerial skills.
Seeking an organization, which recognizes and promotes good managerial
practices? Summary of Qualifications
25+ years’ experience as a Chemical Engineer. 5+ years’ experience as an Engineering Group Leader. Work History
Feb 2012-Present Chart Industries – Woodlands, Texas Project Controls Engineer Schedule development, earned value analysis, and forecasting in
a project controls environment. Utilized Microsoft Project 2010 for scheduling,
analysis and forecasting, on three International $120MM+ LNG Projects, (3500+
activities, EPF). May 2011-Feb 2012 Enbridge - Berthold, North Dakota Field Cost/Schedule Analyst Developing and maintaining Project Progress Templates for 15
contractors. Traveling from site to site, developing progress reports and
schedules on site activities. Primarily using Microsoft Project 2010, some uploading to P6 for
sharing with Canadian office. Jan 07, 2007 - May 15, 2009 Universal Ensco Inc. - Houston, Texas Participate in the conceptual development of construction
projects, oversee organization, scheduling, and produce status update
reports. Proficient
use of Primavera P3, P5, P6, P6.2 and MS Project 2003, 2007, 2010. Jun 01, 1999 - Jan 01, 2007 ShadyRiver Products - Brazoria, Texas As business owner I was responsible for all aspects of this
business startup. Being a lifelong Project Manager I handled this work effort
as a personal project including schedule development, packaging,
distributions and sales. Unfortunately, sales requirements were never
achieved and the business was closed in 2004. Jul 27, 1987 - Jan 31, 2001 BASF Freeport, TX Successfully managing ten projects totaling $5.8 MM, in the
Cyclohexanone and Caprolactam technology. Site
Expert for Primavera, Project Scheduling, Suretrack, and SAP; for Projects
& Construction. Project
Manager for the installation of three small temporary boilers while
installing a new boiler for the Freeport Site. Total cost $12.8 million Dec 01, 1986 - Jul 27, 1987 C L Resins - Texas Jan 01, 1981 - Oct 31, 1986 Northwest Pipeline - Colorado Project Manager for replacement of a rich oil heater and natural
gas heater, while the plant was under repairs for a major fire. Project
manager for a tube replacement, (Turbine Exhaust Waste Heat Boiler), during a
plant turnaround. Jun
01, 1976 – Jan 01, 1981 Vulcan Materials Company Geismar. LA Plant Superintendent (06/78 - 03/81) Two facilities: Chloromethanes and
TIC Chlorine Designed process improvements to
permit a 160TID unit to operate at 250TID; reduced maintenance and operating
costs from $1,200M over budget to $275M under budget; eliminated a severe
corrosion problem; improved on stream time from 93.6% factor to a 97.3% factor. Managed and scheduled hundreds of
turnarounds while maintaining production goals until major plant upgrades
improved on stream time. Production Engineer (06/77 - 06/78) Three facilities: Perc-EDC,
Utilities, and Pollution Control. Directly responsible for startup and
compliance to NPDES permit restrictions of a $4.5MM pollution control
project. Made process revisions to allow
Muriatic Acid Plant to improve production from 120TID to 2l0TID. Process Engineer (09/76 - 06/77) Designed a $150M pollution abatement
system; modified a boiler feed system for waste gas consumption, and designed
a $16,000/yr. energy savings system. AMF Head Ski - (06/74 – 06/77) Manufacturing Engineer/Product
Development Engineer Worked part-time while completing
B.S. in Chemical Engineering. Developed product and production
changes to decrease cost of production and improved product reliability in a
manufacturing facility. Education Sep 1978 - Aug 1982 Louisiana State University - Baton Rouge, Louisiana Sep 1971 - Aug 1976 University of Colorado - Boulder, Colorado Training
Oct 15, 2008 - Jan 15, 2009 PMP
Boot Camp Nov 15, 2009 - Dec, 2008 SAP Jan 15, 1998 - Feb 15, 1999 Primavera Primavera
P3 Advanced Training |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|